Product Introduction
The Retrievable Bridge Plug (RBP) is a specialized downhole tool designed to isolate specific sections of a wellbore, preventing fluid flow between different zones or from the wellbore to the surface during temporary operations. Unlike permanent bridge plugs that are milled out or left in place, and unlike dissolvable plugs that degrade downhole, our retrievable design allows for safe mechanical removal and reuse after completing downhole operations - making it a cost-effective and flexible choice for well intervention, completion, workover, testing, and temporary abandonment projects. The plug can be deployed via e-line, slickline, tubing, or coiled tubing, and does not require a nipple profile for setting - making it ideal for completions with damaged nipples, mono-bore type wells, or wells where no suitable production nipple is available. Once set, the low-stress bi-directional slip system, located below the packing element, provides secure anchoring while minimizing casing damage - particularly valuable for mature wellbores with corrosion or wall loss. The triple elastomer packing element system (HSN or Viton options) withstands multiple pressure reversals, ensuring long-term sealing integrity, while the internal equalization sleeve allows safe pressure equalization before release - activated by simple work string manipulation with no left-hand rotation required. Qualified to ISO 14310 V0/V3 and API 11D1 standards, with NACE MR0175 compliant sour service components for H₂S/CO₂ environments, our retrievable bridge plug delivers pressure ratings from 5,000 to 7,500 PSI (345–520 bar) and temperature resistance from 40°C to 177°C (104°F to 350°F), with tensile load capacity up to 400,000 lb (181,440 kg). The debris-resistant design includes an integrated debris exclusion system and a retrieving head that allows cleanup of well debris above the plug before equalization and release - eliminating the need for additional cleanup trips even in debris-laden wellbores. After retrieval, the plug can be re-dressed with new sealing elements and slips and reused for multiple operations, further lowering long-term project expenses. No tripping tailpipe is required, saving additional rig time and labor costs. Widely applied in oil, gas, and geothermal well operations worldwide - including temporary zonal isolation for fracturing, acidizing, and well testing; well suspension for weather, maintenance, or emergency conditions; wellhead repair and BOP qualification testing; production tubing pressure testing and packer setting; completion plugging in wells with damaged nipples; hanging completion accessories within the tubing string; temporary abandonment for offshore and onshore wells; and recovery operations for stuck downhole equipment - our retrievable bridge plug provides reliable, reusable, cost-effective wellbore isolation without the need for milling or permanent plugging.
Product Features
1. ISO/API Certified Reliability with Sour Service Compliance
Qualified to ISO 14310 V0/V3 and API 11D1 standards, our retrievable bridge plug delivers a high-integrity well barrier, meeting global industry regulatory requirements for pressure sealing and isolation performance. Sour service components comply with NACE MR0175 / ISO 15156 specification for enhanced durability in H₂S/CO₂ corrosive environments, making the plug suitable for sour gas and acidic oil wells. CE certification is also available for European market access.
2. Flexible Conveyance and Deployment - No Nipple Profile Required
Compatible with conventional e-line, slickline, tubing, or coiled tubing (CT) for versatile deployment, allowing both shallow and deep well setting without the need for a nipple profile - ideal for completions with damaged nipples, mono-bore type wells, or wells where no suitable production nipple exists. The compact design enables easy passage through wellbore restrictions, reducing hang-up risks during deployment in deviated and horizontal sections.
3. Efficient Pressure Equalization for Safe Retrieval
Equipped with an internal equalization sleeve and large flow area, the tool allows safe pressure equalization above and below the plug before release, mitigating debris plugging in overbalanced situations and preventing pressurization blowouts during retrieval. The equalization system is activated by simple work string manipulation - no left-hand rotation required - reducing the risk of accidental work string disconnection and simplifying retrieval operations for wireline and slickline crews.
4. Low-Stress Bi-Directional Slip System for Casing Protection
Features a bi-directional, low-stress slip mechanism located below the packing element, providing secure anchoring while minimizing casing contact stress and damage - perfect for mature wellbores with corrosion, wall loss, or reduced casing integrity. Opposed dovetail slips prevent movement in either direction, ensuring stable isolation even during pressure reversals, and the below-element slip location protects the slips from debris accumulation during the isolation period.
5. Debris-Resistant Design with Cleanup Retrieving Head
Integrated debris exclusion system prevents contaminants from entering and damaging internal components, enabling reliable retrieval even in debris-laden wellbores. The retrieving head is designed to allow cleanup of well debris accumulated above the plug before equalization and release - eliminating the need for additional cleanup trips and reducing total rig time. The retrieval tool engages external or internal fishing necks for flexible recovery options.
6. Cost-Saving, Reusable, and Redressable
Eliminates multiple trips to the wellbore, reducing rig time and operational costs. After retrieval, the plug can be re-dressed with new packing elements, slips, and seals, then reused for multiple well operations - significantly lowering long-term project expenses compared to single-use drillable or dissolvable plugs. No tripping tailpipe is required, saving additional rig time and labor costs. The high-strength alloy steel body provides durability for repeated redress cycles.
7. High Pressure and Temperature Rating with Triple Sealing
With pressure ratings from 5,000 to 7,500 PSI (345–520 bar) and temperature resistance from 40°C to 177°C (104°F to 350°F), our retrievable bridge plug performs reliably in extreme downhole conditions from deepwater to inland wells. The triple packing element system - available in HSN or Viton elastomer options - withstands multiple pressure reversals, ensuring long-term sealing integrity. Tensile load capacity reaches up to 400,000 lb (181,440 kg), enabling the plug to hang completion accessories within the tubing string when required (casing must be cemented for full load capacity).
Working Principle
The Retrievable Bridge Plug operates in four phases - deployment and setting, isolation, pressure equalization, and retrieval:
Phase 1: Deployment and Setting
The plug is conveyed to target depth via e-line, slickline, tubing, or coiled tubing. The compact design and smooth profile allow passage through wellbore restrictions, damaged nipples, and mono-bore completions without hang-up. Once on depth, the setting tool activates the slip and packing element system: the low-stress bi-directional slips expand and anchor to the casing/tubing wall, while the triple packing elements compress to form a pressure-tight seal. The opposed dovetail slip design provides bidirectional anchoring. After setting, the running/setting tool releases and is retrieved to surface.
Phase 2: Isolation
Once set, the triple elastomer packing elements and bi-directional slips create a reliable pressure barrier containing differential pressure up to 7,500 PSI from either direction. The plug maintains isolation during the intended operation - whether fracturing, acidizing, well testing, well suspension, wellhead maintenance, pressure testing, or temporary abandonment. The below-element slip location protects slips from debris, and the integrated debris exclusion system prevents contamination of internal components during the isolation period. The plug can remain in the well for extended periods (short-term or long-term well suspension) while maintaining sealing integrity.
Phase 3: Pressure Equalization
When isolation is no longer required, a retrieval tool is run in and engages the external or internal fishing neck on the retrieving head. The retrieving head design allows the retrieval tool to clean or bypass debris accumulated above the plug. Simple work string manipulation (upward strain or mechanical movement, no left-hand rotation required) activates the internal equalization sleeve, opening a large flow area to equalize pressure above and below the plug. This safe equalization prevents pressurization blowouts and mitigates debris plugging in overbalanced conditions.
Phase 4: Retrieval and Redress
After pressure equalization is confirmed, continued upward force releases the slips and retrieves the plug from the wellbore. No milling, drilling, or coiled tubing cleanout is required - the plug is recovered intact as a complete assembly. At surface, the plug is inspected, re-dressed with new packing elements and slip components as needed, and is ready for redeployment in another well or interval. The high-strength alloy steel body supports multiple redress and reuse cycles, reducing long-term operational costs.
Quality Assurance
We are committed to delivering the highest quality downhole tools. Every Retrievable Bridge Plug is manufactured under an ISO 9001:2015 certified quality management system and designed and tested in accordance with API 11D1 and ISO 14310 V0/V3 specifications. Our quality assurance process covers the full product lifecycle:
Raw Material Control
High-strength alloy steel components are sourced from approved suppliers and accompanied by material test reports (MTR) verifying chemical composition, tensile strength, yield strength, hardness, and impact toughness. Sour service components are certified to NACE MR0175 / ISO 15156 for H₂S/CO₂ environments. Elastomer packing elements (HSN and Viton) are tested for hardness, tensile strength, compression set, and fluid compatibility before release to production.
In-Process Manufacturing Control
All components are machined on precision lathes and machining centers with documented process parameters. Critical dimensions - slip dovetail geometry, packing element groove dimensions, equalization sleeve fit, fishing neck dimensions, and body thread connections - are inspected at first-article, in-process, and final inspection stages using calibrated micrometers, bore gauges, and coordinate measuring machines. The slip assembly is tested for uniform expansion and release force.
Performance Testing (100% of production)
• Hydrostatic Pressure Seal Test: Each assembled plug is tested at rated differential pressure (up to 7,500 PSI) from both directions with zero visible leakage as the pass criterion, verifying triple packing element performance under pressure reversal conditions
• Setting and Release Function Test: Sample plugs from each production lot are set and released in test casing/tubing to verify slip expansion, seal compression, pressure equalization function, and slip release for all deployment methods (e-line, slickline, tubing, coiled tubing)
• Tensile Load Verification: Body and connection tensile strength verified to the 400,000 lb rating
• Equalization Flow Test: Internal equalization sleeve flow area and activation force verified
• Dimensional Inspection: 100% verification of critical mating dimensions against engineering drawings
Warranty and Support
We provide a 12-month warranty from the date of shipment against manufacturing defects in materials and workmanship. Our engineering team provides 24/7 technical support including installation guidance, retrieval procedure training, redress/reassembly training, and on-site technical support. If the product has quality problems within the warranty period, we provide free replacement or repair.
Application Scenarios
1. Temporary Zonal Isolation for Stimulation and Testing
Widely used for temporary zonal isolation during formation fracturing, acidizing, matrix stimulation, and well testing operations. The retrievable design allows the plug to be set, hold pressure during the treatment, then be retrieved and reused - eliminating mill-out costs and reducing turnaround time between stages. Suitable for both single-zone and multi-zone operations.
2. Temporary Well Suspension
Used for short-term and long-term well suspension due to weather events, rig maintenance, regulatory requirements, or emergency conditions. The plug provides a reliable pressure barrier during the suspension period, then is retrieved when operations resume - avoiding the cost and permanence of cement plugs or cast iron bridge plugs. Suitable for both onshore and offshore wells.
3. Wellhead Repair, Maintenance, and BOP Testing
Provides a reliable downhole pressure barrier during wellhead repair and replacement operations, including blowout preventer (BOP) qualification testing and maintenance. The retrievable bridge plug isolates the wellbore below the wellhead, allowing safe surface equipment work without killing the well, then is retrieved after operations are complete.
4. Production Tubing Pressure Testing and Packer Setting
Used as a downhole pressure barrier during production tubing pressure testing and packer setting operations. The high tensile load capacity (up to 400,000 lb) allows the plug to serve as a reaction point for packer setting, and the triple packing element system verifies pressure integrity from below.
5. Completion Plugging in Wells with Damaged or No Nipples
Designed for completion plugging in wells with damaged nipples, unsuitable production nipples, or mono-bore completions where no nipple profile is available. Unlike conventional retainers that require a nipple profile for landing, the retrievable bridge plug sets directly against the casing/tubing wall via the slip system - providing a reliable isolation barrier where other tools cannot be used.
6. Hanging Completion Accessories Within Tubing
The high tensile load capacity (up to 400,000 lb) enables the plug to hang completion accessories, pressure gauges, or other downhole equipment within the tubing string when required. Casing must be cemented for full load capacity. This dual function (isolation + hanging) reduces the number of tools required in the wellbore.
7. Temporary Abandonment - Onshore and Offshore
Suitable for temporary abandonment requirements for both offshore and onshore wells, providing a certified pressure barrier (ISO 14310 V0/V3) during the abandonment period. The retrievable design allows the well to be re-entered and the plug recovered when the temporary abandonment period ends - avoiding the cost of drilling out permanent plugs.
8. Recovery Operations for Stuck Downhole Equipment
When used with compatible fishing tools, the retrievable bridge plug can serve as a downhole anchor or reaction point for recovery operations involving stuck downhole equipment. The bidirectional slip system and high tensile capacity provide a stable anchor for jarring or pulling operations, and the plug is retrieved after the fish is recovered.
FAQ
Q: What is the difference between a Retrievable Bridge Plug and a Permanent Bridge Plug?
A: A Retrievable Bridge Plug can be completely retrieved from the wellbore using standard wireline, slickline, or tubing tools after the operation is complete, then re-dressed and reused - it is designed for temporary isolation. A Permanent Bridge Plug (such as a cast iron or composite bridge plug) is milled or drilled out after use and cannot be reused, making it suitable for permanent isolation such as well abandonment. Our Retrievable Bridge Plug is more flexible and cost-effective for most temporary well operations, with no mill-out required and zero debris left behind.
Q: Can the Retrievable Bridge Plug be customized for specific well conditions?
A: Yes, we provide full customization services. We can adjust casing/tubing size, working pressure rating, temperature rating, material (including NACE MR0175 sour service for H₂S/CO₂ wells), elastomer type (HSN or Viton), and conveyance method according to your specific well conditions - including HPHT wells, horizontal/deviated wells, mono-bore completions, and geothermal wells. Contact our engineering team with your well data for a custom configuration.
Q: What is the delivery time, MOQ, and payment method?
A: The MOQ is 1 piece for standard models. Standard products ship within 7–15 working days after deposit; custom sizes or configurations require 15–30 working days. We support urgent order production for qualified projects. We ship from Shanghai or Ningbo port. Payment terms include T/T (30% deposit, 70% before shipment), L/C at sight, and Western Union.
Q: How many times can the plug be re-dressed and reused?
A: The high-strength alloy steel body is designed for multiple redress and reuse cycles. After each retrieval, the plug is inspected, and wearing components - packing elements, slips, and seals - are replaced during re-dressing. The number of reuse cycles depends on well conditions, inspection results, and adherence to redress procedures. We provide complete re-dress kits, reassembly instructions, and training to ensure safe, reliable reuse.
Q: What certifications do the products have?
A: Our Retrievable Bridge Plugs are qualified to API 11D1 and ISO 14310 V0/V3 standards, with NACE MR0175 / ISO 15156 compliant sour service components available, and CE certification for European market access. Third-party inspection reports (BV, SGS, DNV) are available on request. Each shipment includes material test reports and pressure test certificates.
Q: How is the plug retrieved, and what if it gets stuck?
A: The plug is retrieved by running a standard retrieval tool on wireline, slickline, or tubing that engages the external or internal fishing neck on the retrieving head. Simple work string manipulation activates the internal equalization sleeve to equalize pressure, then continued upward force releases the slips and retrieves the plug - no left-hand rotation or milling required. If the plug encounters resistance, the retrieving head design allows debris cleanup above the plug before equalization, and our engineering team provides 24/7 technical guidance for hydraulic or mechanical release procedures to ensure safe retrieval without damaging the wellbore or casing.
Hot Tags: Retrievable Bridge Plug | API 11D1 | ISO 14310 V0/V3 | 7,500 PSI | Reusable | No Mill-Out, China Retrievable Bridge Plug | API 11D1 | ISO 14310 V0/V3 | 7,500 PSI | Reusable | No Mill-Out manufacturers, suppliers, factory, Shorty Composite Bridge Plug, One Trip Openhole Cement Plug, Drillpipe Wiper Plug, PN PXN Plug, frac plugs, Tubing Hanger Plug
| Item | Specification | Remarks |
|---|---|---|
| Product Type | Retrievable Bridge Plug (RBP) - Reusable, Mechanically Retrievable | No mill-out required; API 11D1 / ISO 14310 V0/V3 |
| Nominal Size | 2⅜" – 7" (60.3mm – 177.8mm) | Covers all routinely encountered tubing and casing sizes; custom sizes available |
| Pressure Rating | 5,000 – 7,500 PSI (345 – 520 bar) | Bidirectional pressure containment |
| Temperature Rating | 40°C – 177°C (104°F – 350°F) | - |
| Setting Method | E-line, Slickline, Tubing, Coiled Tubing (CT) | No nipple profile required |
| Retrieval Method | Standard retrieval tools; external and internal fishing necks | Pressure equalization before release; no left-hand rotation |
| Equalization Method | Internal equalization sleeve, large flow area | Activated by work string manipulation |
| Slip System | Low-stress, bi-directional, opposed dovetail, debris-resistant | Located below packing element; minimizes casing damage |
| Sealing Element | Triple packing element system; HSN or Viton elastomer options | Pressure reversal resistant |
| Material | High-strength alloy steel body; NACE MR0175 / ISO 15156 sour service components available | H₂S/CO₂ compatible |
| Tensile Load Capacity | Up to 400,000 lb (181,440 kg) | Casing must be cemented for full load |
| Redress / Reuse | Re-dressable with new packing elements, slips, and seals; multiple reuse cycles | Re-dress kits available |
| Debris Resistance | Integrated debris exclusion system; retrieving head with debris cleanup | No additional cleanup trip required |
| Application | Temporary zonal isolation, fracturing, acidizing, well testing, well suspension, wellhead maintenance, BOP testing, tubing pressure testing, packer setting, temporary abandonment, stuck equipment recovery, geothermal wells | Onshore/offshore; vertical/devitated/horizontal; mono-bore/damaged nipple |
| Standard / Certification | API 11D1, ISO 14310 V0/V3, NACE MR0175 (sour service), CE | BV/SGS/DNV third-party inspection on request |
| MOQ | 1 piece (standard); custom MOQ on request | - |
| Delivery Time | 7 – 15 working days (standard); 15 – 30 working days (custom) | - |
| Packaging | Individual plastic tube + export wooden crate | - |
| Nominal Size | Casing/Tubing OD | Typical Setting Method | Tensile Capacity |
|---|---|---|---|
| 2⅜" (60.3mm) | 60.3mm | Slickline / E-line / Tubing | Per rating |
| 2⅞" (73.0mm) | 73.0mm | Slickline / E-line / Tubing | Per rating |
| 3½" (88.9mm) | 88.9mm | Slickline / E-line / Tubing / CT | Per rating |
| 4" (101.6mm) | 101.6mm | E-line / Tubing / CT | Per rating |
| 4½" (114.3mm) | 114.3mm | E-line / Tubing / CT | Up to 400,000 lb |
| 5" (127.0mm) | 127.0mm | E-line / Tubing / CT | Up to 400,000 lb |
| 5½" (139.7mm) | 139.7mm | Tubing / CT | Up to 400,000 lb |
| 7" (177.8mm) | 177.8mm | Tubing / CT | Up to 400,000 lb |






