PBP Bridge Plug | Modular Convertible to Cement Retainer | 10,000 PSI | 400°F | Mechanical/Wireline/Hydraulic Setting | Cast Iron Drillable

PBP Bridge Plug | Modular Convertible to Cement Retainer | 10,000 PSI | 400°F | Mechanical/Wireline/Hydraulic Setting | Cast Iron Drillable
Details:
The PBP Bridge Plug is a modular drillable downhole isolation tool for oil, gas, and water wells — convertible design allows the same base tool to function as a bridge plug or cement retainer by reconfiguring components, reducing inventory. Drillable cast iron body, single-piece elastomer packing with full-circle backup rings, anti-swab-off design prevents extrusion and misruns. API 11D1 + API Q1 certified, 10,000 PSI (68.95 MPa), 400°F (204°C) HPHT. Three setting methods — mechanical, wireline, or hydraulic — by changing the top slip assembly for optimal conveyance in deviated/high-pressure wells. Hydraulic setting: graded pressure sequence 6–8 MPa (shear pins) → 20–22 MPa (release) → 26–28 MPa (ball seat knock-off) → 80–100 kN (squeeze cementing). Modular components locked against pre-setting; PDC-drillable after use, or retrievable with fishing spear + safety joint for temporary use — bottom cement isolation component prevents cement blockage during retrieval. Casing ID 4½"–5½" standard (custom 2-3/8"–20"), OD 3.826"–4.56". Ideal for zonal isolation, abandonment, casing repair, squeeze cementing, fracturing, well testing, acidizing, and intervention pressure control.
Send Inquiry
Add To Inquiry
Download
Description
Technical Parameters
Product Introduction

 

The PBP Bridge Plug is a drillable, modular downhole tool specifically designed for isolating sections of oil, gas, and water wells during well testing, stimulation, cementing, workover, abandonment, and pressure control operations. Its defining feature is a modular, convertible design that allows the same base tool to function as either a standard bridge plug or a cement retainer by reconfiguring components - eliminating the need to stock separate tool types and maximizing inventory efficiency for service companies and operators. The PBP can be flexibly set via three methods - mechanical, wireline, or hydraulic - simply by changing the top slip assembly, making it suitable for a wide range of well intervention scenarios and rig capabilities. Mechanical setting is ideal for standard tubing-conveyed operations; wireline setting offers rapid deployment without a work string; and hydraulic setting using standard rig pumps provides reliable setting in highly deviated wells where wireline may be less consistent. This triple-setting versatility allows one plug model to cover diverse deployment requirements across a field. Crafted from high-quality drillable cast iron, this bridge plug combines robust construction with easy drillability - reducing rig time and operational costs during post-operation removal. The single-piece elastomer packing element with full-circle backup rings ensures reliable sealing against high differential pressures, while the anti-swab-off design prevents element extrusion during deployment and pressure cycling, minimizing misruns and ensuring long-term isolation integrity. All modular components are securely locked in place during assembly, enabling faster run-ins and reducing the risk of pre-setting. Rated up to 400°F (204°C) and 10,000 PSI (68.95 MPa), the PBP excels in high-temperature, high-pressure (HTHP) well environments, delivering consistent performance even in extreme conditions. It is fully certified to API Spec 11D1 and API Q1 standards, ensuring compliance with global oil and gas industry requirements for safety and performance. The plug can be easily converted to a cement retainer for squeeze cementing and secondary cementing operations, and the hydraulic setting procedure includes a precise graded pressure sequence with a dedicated ball seat knock-off and receiving basket, followed by the ability to apply 80–100 kN of downward force for cement squeezing. For retrievable applications, a dedicated fishing spear combined with a safety joint allows direct recovery, and the bottom cement isolation component prevents cement solidification from blocking retrieval. Whether for temporary sealing, permanent abandonment, secondary cementing, or well intervention, the PBP Bridge Plug is a versatile, cost-effective solution for downhole isolation performance.

 

Product Features

 

1. Triple Setting Method Versatility (Mechanical / Wireline / Hydraulic)

Easily switch between mechanical, wireline, or hydraulic setting methods by changing the top slip assembly, providing flexible conveyance options to adapt to different well conditions - including deviated wells, high-pressure environments, and rigs with varying equipment capabilities. Mechanical setting on tubing is ideal for standard operations; wireline setting offers rapid deployment without a work string; and hydraulic setting using standard rig pumps provides reliable, consistent setting in highly deviated or horizontal wells where wireline setting may be less reliable. This triple-method versatility means one plug model can serve diverse operational requirements across a field, reducing inventory and training costs.

2. Superior Sealing with Anti-Swab-Off Protection

Equipped with a single-piece packing element and full-circle back-up rings, the PBP Bridge Plug ensures reliable sealing against high differential pressures up to 10,000 PSI. The anti-swab-off design prevents packing element extrusion during deployment, pressure cycling, and swabbing operations - minimizing misruns and ensuring long-term isolation integrity even under dynamic downhole conditions. The full-circle backup rings provide 360-degree support to the packing element, preventing extrusion through gaps between slips and maintaining seal integrity at elevated temperatures up to 400°F.

3. High Temperature & Pressure Rating (400°F / 10,000 PSI)

Rated up to 400°F (204°C) and 10,000 PSI (68.95 MPa), this tool excels in high-temperature, high-pressure (HTHP) well environments, delivering consistent performance even in extreme conditions. The cast iron construction and high-performance elastomer packing element maintain structural and sealing integrity at elevated temperatures, making the PBP suitable for deep wells, geothermal applications, and HPHT reservoirs where lower-rated plugs would fail.

4. Modular & Convertible to Cement Retainer

The modular structure allows easy conversion from a bridge plug to a cement retainer - simply by reconfiguring components - reducing the need for multiple tool types and lowering inventory costs for service companies. In cement retainer mode, the plug supports squeeze cementing and secondary cementing operations with a precise hydraulic setting sequence: after setting, the ball seat is knocked off at 26–28 MPa into a receiving basket, and 80–100 kN of downward force can be applied at the wellhead for cement squeezing. All components are securely locked in place during assembly, enabling faster run-ins and reducing the risk of pre-setting.

5. Easy Drillability with Cast Iron Construction

Constructed from drillable cast iron, the PBP Bridge Plug can be quickly drilled out using PDC bits after use, saving valuable rig time and simplifying post-operation procedures. The cast iron produces small, easily circulated cuttings that do not damage the casing or cement sheath, and the modular design means fewer components to drill compared to non-modular steel plugs. For temporary applications, the plug can alternatively be retrieved intact with a fishing spear, eliminating drill-out entirely.

6. API 11D1 & Q1 Certified Quality

Manufactured under stringent quality control standards, the PBP Bridge Plug meets API Spec 11D1 (performance standard for subsurface safety valves and downhole isolation tools) and API Q1 (quality management system for the petroleum and natural gas industries), ensuring compliance with global oil and gas industry requirements for safety, performance, and consistent manufacturing quality. Each unit is pressure tested and inspected before shipment, with full traceability by material heat number and serial number.

 

Working Principle

 

The PBP Bridge Plug operates through a reliable setting and unsealing mechanism to ensure precise isolation:

Setting Process (Hydraulic Method)

1. Run the tool to the designed position via tubing, wireline, or coiled tubing. The modular components are securely locked in place during run-in to prevent pre-setting, and the anti-swab-off design protects the packing element during deployment.

2. Apply positive pressure of 6–8 MPa from the tubing to shear the setting pins, allowing the thrust piston to push the relevant components forward.

3. The cone and full-circle slips firmly clamp onto the casing inner wall, while the rubber cylinder (single-piece packing element) compresses to form a tight, pressure-tight seal. The full-circle backup rings support the element to prevent extrusion.

4. Continue pressurizing to 20–22 MPa to release the plug from the setting tool - the plug is now set and anchored in the casing.

5. Further pressurize to 26–28 MPa to knock off the ball seat, which falls into the receiving basket below - this opens the internal bore for subsequent operations.

6. Depressurize the tubing and apply 80–100 kN of downward pressure at the wellhead to perform cement squeezing operations if the plug is configured as a cement retainer.

Setting Process (Mechanical / Wireline Method)

For mechanical setting on tubing or wireline setting with a dedicated wireline setting tool, the setting force is applied mechanically rather than hydraulically. The top slip assembly is changed to match the selected setting method. The slip expansion, packing element compression, and seal formation are identical to the hydraulic method - only the actuation force source differs.

Unsealing / Retrieval Process

For retrievable applications: use a dedicated fishing spear combined with a safety joint to directly engage and fish the plug. The bottom is equipped with a cement isolation part to prevent cement solidification from blocking the retrieval connection. Once engaged, upward tension releases the slips and the plug is recovered intact to surface. For permanent isolation: the pipe column can remain in place without unsealing, or the cast iron plug can be drilled out with PDC bits when future re-entry is required.

 

Customization Capabilities

 

We offer comprehensive customization to match specific well conditions:

• Custom casing sizes beyond the standard 4½"–5½" range, from 2-3/8" to 20"

• Custom pressure and temperature ratings (standard 10,000 PSI / 400°F)

• Elastomer packing element selection (Nitrile, HNBR, Viton, Aflas) based on wellbore fluids

• Setting method configuration (mechanical-only, wireline-only, hydraulic-only, or triple-method)

• Cement retainer conversion kit for squeeze cementing operations

• Retrievable or permanent (drillable) configuration

• Custom top slip assemblies for special setting tools

• Special material upgrades for corrosive environments (H2S/CO2 service)

• OEM/ODM branding and custom packaging

Lead time for custom orders: 15–25 working days depending on complexity; sample evaluation units available before bulk orders.

 

Quality Assurance

 

We are committed to delivering products of the highest quality. Each PBP Bridge Plug undergoes strict quality inspections throughout the manufacturing process, from raw material selection to final assembly and testing. Our production facilities adhere to API Spec Q1 quality management system and ISO 9001 standards, ensuring that every tool meets or exceeds industry performance requirements.

Quality Control Process

• Raw Material Inspection: Cast iron and elastomer materials sourced from approved suppliers with material test reports (MTR) verifying chemical composition, tensile strength, hardness, and temperature/pressure ratings. Elastomer packing elements tested for hardness, tensile strength, compression set, and fluid compatibility.

• In-Process Control: Precision machining with documented parameters; critical dimensions - slip tooth geometry, packing element groove, full-circle backup ring fit, ball seat, receiving basket, and modular component lock - inspected at first-article, in-process, and final stages.

• Finished Product Testing:

- Hydrostatic Pressure Seal Test: Each assembled plug tested at rated differential pressure (up to 10,000 PSI) with zero visible leakage

- Setting Function Test: Sample plugs set in test casing via all three methods (mechanical, wireline, hydraulic) to verify slip expansion, packing element compression, and graded pressure sequence (6–8 MPa shear, 20–22 MPa release, 26–28 MPa ball seat knock-off)

- Anti-Swab Test: Verified that packing element does not extrude during pressure cycling

- Cement Retainer Conversion Test: Conversion kit verified for proper fit and squeeze cementing capability

- Retrieval Test: Fishing spear engagement and pull force verified

- Dimensional Inspection: 100% verification of critical dimensions 

Warranty

12-month warranty from date of shipment against manufacturing defects, with timely after-sales support and 24-hour technical assistance for setting procedure, retrieval, and troubleshooting.

 

Application Scenarios

 

1. Temporary and Permanent Zonal Isolation

Provides reliable temporary and permanent isolation of oil, gas, and water layers during well operations - preventing fluid cross-flow between zones and ensuring accurate testing, stimulation, and production results. The retrievable configuration allows recovery after temporary operations, while the drillable cast iron construction supports permanent isolation and well abandonment. The triple setting method ensures deployment flexibility across different well types.

2. Well Abandonment and Casing Repair

Suitable for well abandonment (P&A) operations requiring long-term, high-integrity isolation, and for casing repair operations where a reliable downhole barrier is needed above or below the repair section. The 10,000 PSI / 400°F rating and API 11D1 certification meet regulatory P&A requirements, and the cast iron construction allows drill-out if future re-entry is planned.

3. Secondary Cementing and Squeeze Cementing

Converts to a cement retainer for secondary cementing and squeeze cementing operations - including remedial cementing behind casing, sealing water or gas influx, and repairing poor primary cement jobs. The graded hydraulic setting sequence (6–8 MPa shear → 20–22 MPa release → 26–28 MPa ball seat knock-off → 80–100 kN squeeze force) provides precise control for cement placement, and the bottom cement isolation component prevents cement from blocking the retrieval connection.

4. Multi-Stage Fracturing and Stimulation

Enables efficient zonal isolation for multi-stage fracturing and stimulation operations, supporting unconventional reservoir development including shale gas and tight oil. The modular design and fast run-in reduce operational time between stages, and the anti-swab-off design ensures reliable sealing during high-rate fracturing pressure cycles. The cast iron drillable construction allows fast post-frac removal with PDC bits.

5. Well Testing and Acidizing Treatments

Provides a reliable downhole barrier during well testing, pressure testing, and acidizing treatments - isolating lower zones while upper zone operations are performed. The wireline setting method allows rapid deployment for well testing without a work string, and the pressure equalization during retrieval (via the fishing spear procedure) ensures safe recovery without pressure surges.

6. Pressure Control and Fluid Isolation During Well Interventions

Serves as a pressure control barrier and fluid isolation tool during well interventions, workovers, and equipment maintenance - including Christmas tree servicing, BOP repair, and wellhead maintenance. The hydraulic setting method using standard rig pumps is ideal for workover rigs without wireline capability, and the compact design allows deployment through existing completion equipment.

 

FAQ

 

Q: What does "PBP" stand for?

A: PBP refers to our modular bridge plug product line. The key advantage of the PBP design is its modular, convertible architecture - the same base tool can be configured as a standard bridge plug or converted to a cement retainer, and it supports three setting methods (mechanical, wireline, hydraulic) by changing the top slip assembly. Contact our sales team for the full product designation and technical datasheet.

 

Q: How does the convertible-to-cement-retainer feature work?

A: The PBP Bridge Plug uses a modular component design. By reconfiguring specific components (adding the cement retainer conversion kit), the plug functions as a cement retainer capable of squeeze cementing operations. In cement retainer mode, after the plug is set hydraulically, the ball seat is knocked off at 26–28 MPa into a receiving basket, opening the internal bore. Then 80–100 kN of downward force applied at the wellhead allows cement to be squeezed through the retainer into the annulus or formation. This eliminates the need to stock separate bridge plugs and cement retainers.

 

Q: What are the three setting methods and how do I choose?

A: The PBP supports mechanical, wireline, and hydraulic setting - selected by changing the top slip assembly:

• Mechanical: Set on tubing with mechanical tension/pressure, ideal for standard tubing-conveyed operations.

• Wireline: Set with a dedicated wireline setting tool, offers rapid deployment without a work string.

• Hydraulic: Set using standard rig pumps through the tubing, most reliable in highly deviated/horizontal wells and on rigs without wireline equipment. Choose based on available rig equipment, well trajectory, and operational preference. All three methods produce the same set and seal quality.

 

Q: What is the graded pressure setting sequence for hydraulic setting?

A: The hydraulic setting procedure follows a precise sequence: (1) 6–8 MPa to shear the setting pins and initiate setting; (2) the cone and slips expand, packing element compresses to seal; (3) 20–22 MPa to release the plug from the setting tool; (4) 26–28 MPa to knock off the ball seat into the receiving basket; (5) depressurize and apply 80–100 kN downward force for squeeze cementing if configured as a cement retainer. This graded sequence ensures controlled, reliable setting and prevents premature or incomplete setting.

 

Q: How is the plug retrieved or removed?

A: For retrievable applications: a dedicated fishing spear combined with a safety joint is run to engage the plug, and upward tension releases the slips for intact recovery to surface. The bottom cement isolation component prevents cement from blocking the retrieval connection. For permanent applications: the cast iron plug can be drilled out with PDC bits, producing small, easily circulated cuttings - or left in place permanently for abandonment.

 

Q: What is the MOQ, delivery time, and payment method?

A: The MOQ is 1 piece for standard models. Standard products ship within 7–15 working days after deposit; custom sizes or configurations require 15–25 working days. We ship from Shanghai or Ningbo port. Payment terms include T/T (30% deposit, 70% before shipment), L/C at sight, and Western Union. Sample evaluation units available.

 

Hot Tags: PBP Bridge Plug | Modular Convertible to Cement Retainer | 10,000 PSI | 400°F | Mechanical/Wireline/Hydraulic Setting | Cast Iron Drillable, China PBP Bridge Plug | Modular Convertible to Cement Retainer | 10,000 PSI | 400°F | Mechanical/Wireline/Hydraulic Setting | Cast Iron Drillable manufacturers, suppliers, factory, Tubing Hanger Plug, PBP Bridge Plug, Drill pipe Wiper Plug, Composite Plug, Thermal Bridge Plug, Single Slip Soluble Bridge Plug

Item Specification Remarks
Product Type PBP Bridge Plug Modular; convertible to cement retainer
Material Cast Iron (Drillable) High-quality, PDC drillable
Setting Method Mechanical / Wireline / Hydraulic Select by changing top slip assembly
Hydraulic Setting Sequence 6–8 MPa shear pins → 20–22 MPa release → 26–28 MPa ball seat knock-off → 80–100 kN squeeze force Graded pressure control
Temperature Rating Up to 400°F (204°C) HTHP capable
Pressure Rating Up to 10,000 PSI (68.95 MPa / 689.5 bar) -
Casing ID Range (Standard) 4½" – 5½" (114.3mm – 139.7mm) -
Casing ID Range (Custom) 2-3/8" – 20" (60.3mm – 508.0mm) Custom sizes available
Casing Weight Range 9.5 – 23 lbs/ft (Clarified: casing weight, not plug weight)
Outer Diameter (OD) 3.826" – 4.56" (97.2mm – 115.8mm) Size-specific
Sealing System Single-piece packing element + full-circle backup rings Anti-swab-off design
Slip Type Full-circle slips (top slip assembly changeable by setting method) Secure casing engagement
Anti-Preset Components securely locked during assembly; anti-swab-off protection Prevents premature setting
Conversion Easily convertible to cement retainer Modular reconfiguration; squeeze cementing capable
Ball Seat Knock-off at 26–28 MPa; falls into receiving basket Opens internal bore
Retrieval Method Dedicated fishing spear + safety joint (retrievable); PDC drill-out (permanent) Bottom cement isolation component prevents blockage
Deployment Tubing, wireline, coiled tubing -
Application Temporary/permanent isolation, P&A, casing repair, secondary/squeeze cementing, multistage fracturing, well testing, acidizing, workover pressure control -
Standard / Certification API Spec 11D1, API Q1, ISO 9001:2015 CE, BV/SGS/DNV on request
MOQ 1 piece (standard); custom MOQ on request -
Delivery Time 7 – 15 working days (standard); 15 – 25 working days (custom) -
Packaging Individual plastic tube + export wooden crate -

 

 

Casing ID Casing Size Plug OD (approx.) Setting Method Configuration
4½" (114.3mm) 4½" casing 3.826" (97.2mm) Mechanical / Wireline / Hydraulic Bridge Plug / Cement Retainer
5" (127.0mm) 5" casing ~4.20" (106.7mm) Mechanical / Wireline / Hydraulic Bridge Plug / Cement Retainer
5½" (139.7mm) 5½" casing 4.56" (115.8mm) Mechanical / Wireline / Hydraulic Bridge Plug / Cement Retainer
Custom 2-3/8"–20" Custom sizes Size-specific Mechanical / Wireline / Hydraulic Bridge Plug / Cement Retainer
Send Inquiry