Hybrid Frac Plug | Composite + Dissolvable | 10,000 PSI | 3-Min Drill-Out | 47% Less Material | Ball Drop / Ball in Place

Hybrid Frac Plug | Composite + Dissolvable | 10,000 PSI | 3-Min Drill-Out | 47% Less Material | Ball Drop / Ball in Place
Details:
The Hybrid Frac Plug is a multistage fracturing completion tool combining high-strength composite with dissolvable elements — composite structural reliability plus dissolvable minimal-debris convenience in one hybrid design. Features patented element backup mechanism (prevents seal extrusion), ceramic gripping buttons, segmented backup rings (enhanced anchoring + anti-rotation during drill-out), molded/filament-wound composite construction, and optional pumpdown ring (25% less fluid consumption). 10,000 PSI zonal isolation, wide temperature range, freshwater and high-salinity formations. 47% less material than traditional composite plugs, ~3-minute drill-out (3x faster), minimal bit wear, multiple drill-outs per trip, reduced NPT and cost. Ball-drop and ball-in-place configurations, industry-standard frac balls, compact lightweight for fast pumpdown/run-in in horizontal/vertical/directional wells. Sizes 4½", 5½", 6.0" (custom). Ideal for shale gas, tight gas, coalbed methane, conventional stimulation — faster drill-out, less debris, lower fluid cost than all-composite or all-dissolvable plugs.
Send Inquiry
Add To Inquiry
Download
Description
Technical Parameters
Product introduction

 

The Hybrid Frac Plug is an advanced downhole completion tool designed for multistage hydraulic fracturing, serving as a temporary barrier to isolate different sections of the wellbore during stimulation treatments. Unlike traditional single-material plugs - whether all-composite or all-dissolvable - our hybrid design integrates high-strength composite and dissolvable materials, merging the durability and pressure-holding capability of composite plugs with the predictable dissolution and minimal-debris convenience of dissolvable solutions to eliminate operational bottlenecks and reduce non-productive time (NPT). The composite components provide structural strength and reliable anchoring during fracturing, while dissolvable elements break down in wellbore fluids after stimulation, leaving minimal debris and reducing the volume of material that must be drilled out. With 47% less material than traditional composite plugs, the hybrid design achieves an average drill-out time of approximately 3 minutes per plug - three times faster than the conventional composite standard - minimizing bit wear and allowing operators to complete more plug drill-outs in a single trip without bit changes. The patented element backup mechanism further enhances sealing performance by preventing leakage from seal extrusion failures under high differential pressure. Ceramic gripping buttons and segmented backup rings enhance anchoring strength and prevent component rotation during drill-out, while the molded and filament-wound composite construction is optimized for both pressure containment and fast drill-out. With a focus on downhole efficiency, this plug is engineered to perform reliably in a wide range of wellbore temperatures and environments - from freshwater to high-salinity formations - with no geolocation limitations. It is compatible with both ball-in-place and ball-drop configurations, offering flexibility to adapt to specific operational needs, and the optional pumpdown ring reduces fluid consumption by up to 25% compared to competitor plugs, ensuring precise installation and stable anchoring while lowering operational costs. Backed by field-proven performance and rigorous quality testing to API and ISO standards, our Hybrid Frac Plug ensures consistent performance even under extreme downhole conditions, making it the ideal choice for operators seeking to optimize completions and maximize production yields across shale gas, tight gas, coalbed methane, and conventional reservoirs.

 

Product Features

 

1. Superior Zonal Isolation with Patented Seal Backup

Delivers reliable wellbore zonal isolation to ensure effective multistage fracturing, preventing fluid cross-flow between zones and maximizing stimulation efficiency. The patented element backup mechanism further enhances sealing performance by preventing leakage from seal extrusion failures under high differential pressure - a common failure mode in conventional frac plugs where the packing element extrudes through gaps under sustained pressure. The backup ring design contains the element and maintains seal integrity throughout the fracturing operation.

2. Industry-Leading 3-Minute Drill-Out Performance

Engineered with 47% less material than traditional composite plugs, our Hybrid Frac Plug achieves an average drill-out time of approximately 3 minutes per plug - three times faster than the conventional composite standard. This significant reduction in drill-out time minimizes bit wear, allowing operators to complete more plug drill-outs in a single trip without bit changes, reducing costs, trip time, and non-productive time (NPT). The dissolvable elements further reduce debris volume, and the ceramic gripping buttons and segmented backup rings prevent component rotation during drill-out for smooth, efficient milling.

3. Hybrid Composite + Dissolvable Material Design

Combines composite and dissolvable materials to offer unparalleled versatility. The composite components - molded and filament-wound - provide structural strength, pressure containment, and durable anchoring during fracturing operations, while dissolvable elements ensure predictable dissolution in wellbore fluids after stimulation, leaving minimal debris and eliminating the need for costly cleanup operations. This hybrid approach allows the plug to perform reliably across diverse basins and well conditions without geolocation limitations - from freshwater to high-salinity formations - and avoids the dissolution unpredictability of all-dissolvable plugs in certain fluid chemistries.

4. Enhanced Pumpdown Efficiency with Optional Pumpdown Ring

Equipped with an optional pumpdown ring that reduces fluid consumption by up to 25% compared to competitor plugs, ensuring precise installation and stable anchoring while lowering water and friction reducer costs. The compact, lightweight design improves pumpdown speed and run-in-hole line speeds, further optimizing operational efficiency in long horizontal laterals where pumpdown time and fluid volume are significant cost drivers. The pumpdown ring also improves plug stability during deployment, reducing the risk of premature setting or hang-up in deviated sections.

5. Exceptional Durability with Ceramic Gripping Buttons

Constructed with molded and filament-wound composite materials for optimized pressure containment and drill-out performance, featuring ceramic gripping buttons that provide superior casing engagement and anchoring strength compared to conventional cast iron slips, and segmented backup rings that enhance anchoring and prevent component rotation during drill-out. Compatible with industry-standard frac balls from 1.25" to 2.375" OD (depending on plug size - see specification table) and a wide range of casing sizes including 4½", 5½", and 6.0", making it suitable for both vertical and horizontal well applications. Custom sizes available on request.

6. Cost-Saving Solution Across the Completion Cycle

Reduces operational costs by minimizing drill-out time, bit wear, fluid consumption, and cleanup requirements. The ability to complete multiple drill-outs with a single bit eliminates the need for bit trips, further lowering operational expenses and improving project profitability. Compared to all-dissolvable plugs, the hybrid design offers more predictable pressure performance at a lower material cost; compared to all-composite plugs, it offers faster drill-out and less debris - delivering the optimal balance of performance and cost for multistage fracturing operations.

 

Working Principle

 

The Hybrid Frac Plug operates in four phases - pumpdown deployment, setting and isolation, fracturing, and drill-out:

Phase 1: Pumpdown Deployment

The Hybrid Frac Plug is conveyed into the wellbore via pumpdown - pumped down the casing with fracturing fluid, either in a ball-drop configuration (where the plug is pumped down and a ball is dropped later to actuate) or a ball-in-place configuration (where the ball is pre-installed in the plug). The optional pumpdown ring improves hydrodynamic efficiency, reducing fluid consumption by up to 25% and improving pumpdown speed in long horizontal laterals. The compact, lightweight design allows the plug to travel through deviated wellbores and casing restrictions without hang-up.

Phase 2: Setting and Isolation

Once the plug reaches the target depth, the frac ball is seated on the plug's ball seat (either by dropping in ball-drop configuration or by the pre-installed ball in ball-in-place configuration). Pump pressure is applied, which drives the slip cone forward to expand the ceramic gripping buttons outward against the casing wall, anchoring the plug in place. Simultaneously, the packing element is compressed to form a pressure-tight seal. The patented element backup mechanism prevents seal extrusion under high pressure. The segmented backup rings provide additional anchoring support and prevent component rotation. Once set, the plug provides reliable zonal isolation up to 10,000 PSI.

Phase 3: Fracturing Operation

With the plug set and the lower zone isolated, fracturing operations proceed on the upper zone - fracturing fluid and proppant are pumped through perforations above the plug into the target formation. The plug maintains pressure isolation throughout the stimulation treatment, preventing fluid cross-flow into the lower zone. The composite structure provides reliable pressure containment, while the dissolvable elements remain intact during the fracturing operation (dissolution occurs over a longer timeframe after stimulation).

Phase 4: Drill-Out

After all fracturing stages are complete, the plug is drilled out using a PDC bit on coiled tubing or drill pipe. With 47% less material than traditional composite plugs and an average drill-out time of approximately 3 minutes per plug, the drill-out is fast and efficient. The ceramic gripping buttons and segmented backup rings prevent component rotation during milling, ensuring smooth cutting. The dissolvable elements have partially or fully dissolved by this point, further reducing debris volume. The resulting cuttings are small and easily circulated out of the well. After all plugs are drilled out, the well is ready for flowback and production.

 

Customization Capabilities

 

We offer comprehensive customization to match specific well conditions:

• Custom casing sizes beyond the standard 4½", 5½", and 6.0" range

• Custom pressure ratings (standard 10,000 PSI)

• Custom temperature ratings with specialized elastomers

• Dissolvable material formulation customization for specific wellbore fluid chemistry and salinity

• Ball-drop or ball-in-place configuration

• Optional pumpdown ring for reduced fluid consumption

• Custom frac ball size compatibility

• Custom composite material formulation for special well conditions

• OEM branding and custom packaging

Lead time for custom orders: 15–30 working days depending on complexity; sample evaluation units available before bulk orders.

 

Quality Assurance

 

We adhere to strict quality control standards throughout the manufacturing process, from raw material selection to final product testing. Our Hybrid Frac Plug undergoes rigorous performance testing to ensure it meets or exceeds industry standards including API Spec 11D1 and ISO 14310.

Quality Control Process

• Raw Material Inspection: Composite materials (molded and filament-wound), dissolvable materials, ceramic gripping buttons, and elastomer packing elements sourced from approved suppliers with material test reports (MTR) verifying composition, mechanical properties, and temperature/pressure ratings. Dissolvable material dissolution rate verified per batch.

• In-Process Control: Precision machining and molding with documented parameters; critical dimensions - ceramic button geometry, packing element groove, ball seat dimensions, backup ring fit, and compressed OD - inspected at first-article, in-process, and final stages.

• Finished Product Testing:

- Hydrostatic Pressure Seal Test: Each assembled plug tested at 10,000 PSI differential pressure with zero visible leakage

- Setting Function Test: Sample plugs set in test casing via ball-drop/ball-in-place actuation to verify ceramic button expansion, packing element compression, and seal integrity

- Drill-Out Performance Test: Representative samples drilled with PDC bits to verify drill-out time (target ≤3 minutes average) and cutting characteristics

- Dissolution Test: Dissolvable elements tested in representative wellbore fluids to verify dissolution rate and debris characteristics

- Dimensional Inspection: 100% verification of critical dimensions

Patent Information

Our Hybrid Frac Plug design may be covered by one or more patents or pending patent applications, including the element backup mechanism and hybrid material configuration, reflecting our commitment to technological innovation and industry leadership.

Warranty

12-month warranty from date of shipment against manufacturing defects, with 24-hour technical support for running procedures, pumpdown optimization, and drill-out troubleshooting.

 

Application Scenarios

 

1. Horizontal Well Multistage Fracturing

The primary application for hybrid frac plugs in horizontal completions, where compact design, efficient pumpdown, and fast drill-out performance are critical for reducing operational time in long laterals. The hybrid design's 3-minute average drill-out and 47% less material significantly reduce coiled tubing time and costs compared to conventional composite plugs, while the optional pumpdown ring reduces fluid consumption in extended-reach horizontals.

2. Vertical and Directional Wells

Delivers reliable zonal isolation for vertical and directional well completions, adapting to diverse wellbore trajectories and conditions. The ball-drop and ball-in-place configuration options provide deployment flexibility for different well types and operational preferences, and the wide temperature and salinity compatibility ensures reliable performance across diverse basins.

3. Onshore and Offshore Operations

Suitable for both onshore and offshore fracturing projects, withstanding the harsh conditions of offshore environments while maintaining consistent performance. The fast drill-out and minimal debris characteristics are particularly valuable in offshore operations where rig time is expensive and debris management is critical. The compact design is compatible with offshore rig pumpdown and coiled tubing equipment.

4. Unconventional Reservoir Development

Perfectly suited for the exploration and production of unconventional oil and gas resources - including shale gas, tight gas, and coalbed methane - where advanced completion technologies with multistage fracturing are required to optimize extraction efficiency. The hybrid design balances the pressure reliability of composite plugs with the minimal-debris advantage of dissolvable plugs, making it ideal for the high-stage-count completions typical in unconventional reservoirs. As global demand for unconventional resources grows, the Hybrid Frac Plug has become a critical tool for operators seeking to maximize recovery rates while reducing completion costs.

 

FAQ

 

Q: What makes the Hybrid Frac Plug different from all-composite or all-dissolvable frac plugs?

A: The Hybrid Frac Plug combines both materials: high-strength composite provides structural reliability and pressure containment during fracturing, while dissolvable elements break down after stimulation to reduce debris volume. This delivers 47% less material and an average 3-minute drill-out (faster than all-composite) with more predictable pressure performance than all-dissolvable plugs - which can have variable dissolution rates in certain fluid chemistries. It is the optimal balance of performance and cost.

 

Q: How fast is the drill-out and how much debris is generated?

A: The average drill-out time is approximately 3 minutes per plug - three times faster than conventional composite plugs - due to the 47% reduction in material volume and the dissolvable elements that partially break down before drill-out. The ceramic gripping buttons and segmented backup rings prevent component rotation during milling, producing small, easily circulated cuttings. Multiple plugs can typically be drilled out in a single trip without bit changes.

 

Q: What is the difference between ball-drop and ball-in-place configurations?

A: In a ball-drop configuration, the plug is pumped down to depth first, then a frac ball is dropped from surface and pumped down to seat on the plug's ball seat to actuate setting. In a ball-in-place configuration, the ball is pre-installed in the plug before running, and the plug+ball assembly is pumped down together - the ball seats automatically when the plug reaches depth or when pressure is applied. Ball-in-place saves a trip step but requires the ball to withstand pumpdown conditions; ball-drop offers more control over timing. Both configurations are available.

 

Q: What casing sizes and pressure ratings are available?

A: Standard sizes cover 4½", 5½" (two weight ranges), and 6.0" casing, all rated to 10,000 PSI differential pressure. Custom sizes are available on request. The temperature rating depends on the selected elastomer and dissolvable material formulation - contact our engineering team with your wellbore temperature and fluid chemistry for a specific recommendation.

 

Q: Does the optional pumpdown ring really reduce fluid consumption?

A: Yes. The pumpdown ring improves the hydrodynamic profile of the plug during pumpdown, reducing the fluid volume and pump rate required to move the plug down the horizontal lateral - by up to 25% compared to competitor plugs without this feature. This reduces water, friction reducer, and disposal costs, and also improves pumpdown speed and plug stability. The pumpdown ring is optional and can be specified at ordering.

 

Q: What is the delivery time, MOQ, and payment method?

A: The MOQ is 1 piece for standard models. Standard products ship within 7–15 working days after deposit; custom sizes or configurations require 15–30 working days. We ship from Shanghai or Ningbo port. Payment terms include T/T (30% deposit, 70% before shipment), L/C at sight, and Western Union. Sample evaluation units available.

 

Hot Tags: Hybrid Frac Plug | Composite + Dissolvable | 10,000 PSI | 3-Min Drill-Out | 47% Less Material | Ball Drop / Ball in Place, China Hybrid Frac Plug | Composite + Dissolvable | 10,000 PSI | 3-Min Drill-Out | 47% Less Material | Ball Drop / Ball in Place manufacturers, suppliers, factory, Series Composite Bridge Plug, Drill pipe Wiper Plug, Tubing Hanger Plug, Composite Bridge Plug, Subsurface Release Plugs, Pumpdown Composite Plug

Item Specification Remarks
Product Type Hybrid Frac Plug (Composite + Dissolvable) Multistage hydraulic fracturing zonal isolation
Material Molded & filament-wound composite; dissolvable elements; ceramic gripping buttons; segmented backup rings; elastomer packing element 47% less material vs. traditional composite
Temperature Rating Standard elastomer: consult factory; custom formulations available for high/low temp To be specified by engineering
Pressure Rating 10,000 PSI (68.95 MPa / 689.5 bar) All standard sizes
Average Drill-Out Time ~3 minutes per plug (PDC bit) 3x faster than conventional composite
Seal Backup Patented element backup mechanism Prevents seal extrusion failure
Slip / Anchor Type Ceramic gripping buttons + segmented backup rings Anti-rotation during drill-out
Setting Actuation Ball Drop or Ball in Place Frac ball seats on ball seat; pressure actuates setting
Frac Ball Compatibility 1.25" – 2.375" OD (size-specific; see table above) Industry-standard frac balls
Pumpdown Ring Optional - reduces fluid consumption up to 25% -
Dissolution Dissolvable elements dissolve in wellbore fluids after stimulation Minimal debris; formulation customizable by fluid chemistry
Fluid Compatibility Freshwater to high-salinity formations No geolocation limitation
Well Type Horizontal, vertical, directional; onshore, offshore -
Application Shale gas, tight gas, coalbed methane, conventional reservoir multistage fracturing -
Standard / Certification API Spec 11D1, ISO 14310, ISO 9001:2015 CE, BV/SGS/DNV on request; patent pending
MOQ 1 piece (standard); custom MOQ on request -
Delivery Time 7 – 15 working days (standard); 15 – 30 working days (custom) -
Packaging Individual plastic tube + export wooden crate -

 

 

Casing Size Casing Weight (lbs/ft) Max Pressure (PSI) Overall Length Compressed OD Ball Size Conveyance
4½" (114.3mm) 13.5 – 15.1 10,000 12.4" (315.0mm) 3.45" (87.6mm) 1.25" (31.8mm) Ball Drop / Ball in Place
5½" (139.7mm) 20.0 – 23.0 10,000 12.1" (307.3mm) 4.37" (111.0mm) 1.75" (44.5mm) Ball Drop / Ball in Place
5½" (139.7mm) 23.0 – 26.0 10,000 12.2" (309.9mm) 4.18" (106.2mm) 1.75" (44.5mm) Ball Drop / Ball in Place
6.0" (152.4mm) 23.0 – 26.0 10,000 13.5" (342.9mm) 4.85" (123.2mm) 1.75" (44.5mm) Ball Drop / Ball in Place
Send Inquiry