Plugging Balls

Plugging Balls
Details:
The Degradable Plugging Ball is a soluble polymer spherical temporary plugging tool engineered for hydraulic fracturing diversion operations. Pumped downhole with fracturing fluid, these balls seat into and seal round perforation holes — temporarily blocking already-stimulated high-permeability zones and forcing fracturing fluid to divert toward low-permeability intervals for more uniform reservoir stimulation. Manufactured from fully degradable polymer materials, the balls dissolve completely in wellbore fluids after stimulation — leaving no residue and requiring no mill-out or coiled tubing intervention. Available in four temperature grades (LB40/LB60/HB90/HB120) covering 20°C to 150°C, seven standard diameters from 9mm to 26mm, with compressive strength up to 50MPa and customizable dissolution rates from 12 to 72 hours — this intervention-free plugging ball is the ideal diversion solution for refracturing, multi-stage fracturing, vertical well stratified fracturing, and complex well stimulation in shale gas, tight oil, and low-permeability reservoirs.
Send Inquiry
Add To Inquiry
Download
Description
Technical Parameters
Product Introduction

 

The Degradable Plugging Ball (also known as soluble frac ball or temporary plugging ball) is a spherical temporary plugging and diversion tool specifically developed for hydraulic fracturing operations. Conventional fracturing fluids tend to flow preferentially into high-permeability zones, leaving low-permeability intervals unstimulated. The plugging ball solves this problem by sealing perforations in already-fractured zones, temporarily blocking these high-permeability flow channels and forcing the fracturing fluid to divert into untreated low-permeability layers - achieving more uniform zonal stimulation and maximizing stimulated reservoir volume.

We have developed a full series of degradable plugging balls covering low temperature (LB40, 20–60°C), medium temperature (LB60, 60–90°C), high temperature (HB90, 90–120°C), and ultra-high temperature (HB120, 120–150°C) grades - adapting to diverse geological and downhole conditions. All grades exhibit excellent dissolution and degradation properties, with adjustable degradation rates to match specific operational timelines. Currently available standard diameters include: 9mm, 12mm, 14mm, 15mm, 19mm, 22mm, and 26mm. Custom diameters and degradation rates can be manufactured to match specific well conditions, perforation sizes, and operational requirements.

The plugging ball is manufactured from fully degradable polymer formulations that dissolve completely in wellbore chloride fluids after the fracturing operation, breaking down into non-toxic soluble byproducts that are circulated out during flowback. This eliminates the need for milling, coiled tubing cleanout, or any post-frac intervention - restoring full wellbore access and reducing total completion cost. The spherical geometry ensures smooth pump-down through the wellbore and reliable seating in circular perforation holes, making it one of the most widely used temporary diversion tools in modern fracturing operations.

 

Product Features

 

1. Spherical Geometry for Reliable Perforation Seating

The smooth spherical shape enables unobstructed pump-down through tubing and casing, then reliably seats into circular perforation holes to create a tight pressure-resistant seal. The ball's uniform geometry ensures consistent seating behavior across multiple perforations in a single stage.

2. Fully Degradable, Zero Residue

Manufactured from soluble polymer materials, each ball dissolves completely in wellbore chloride fluids after stimulation - degrading into non-toxic soluble byproducts with no solid residue, eliminating mill-out operations, and avoiding formation damage associated with residual plugging material.

3. Four Temperature Grades, Wide Adaptability

Available in four grades - LB40 (20–60°C), LB60 (60–90°C), HB90 (90–120°C), and HB120 (120–150°C) - covering low, medium, high, and ultra-high temperature wells. Each grade is formulated for optimal plugging performance and controlled degradation at its target temperature range.

4. Seven Standard Diameters + Customization

Standard diameters: 9mm, 12mm, 14mm, 15mm, 19mm, 22mm, 26mm - covering common perforation sizes from small to large. Custom diameters available to match specific perforation dimensions and casing IDs.

5. High Compressive Strength

LB40/LB60 grades: ≥40MPa compressive strength. HB90/HB120 grades: ≥50MPa compressive strength. Maintains structural integrity and sealing performance during high-pressure fracturing operations, with no premature deformation or collapse.

6. Customizable Dissolution Rate

Dissolution time ranges from 12 hours to 72 hours depending on grade and temperature, with custom formulations available for faster or slower degradation to match your operational timeline. The degradation rate is controlled by polymer formulation and downhole temperature.

7. Simple Pump-Down Deployment

No specialized setting tools or wireline equipment required - the balls are simply pumped downhole with fracturing fluid using standard pumping equipment. The smooth spherical profile ensures unobstructed passage through the wellbore, with seating occurring naturally at the perforation interval.

 

Working Principle

 

The Degradable Plugging Ball operates in three stages:

1. Deployment Stage

The plugging balls are mixed with fracturing fluid or carrier fluid and pumped downhole using standard pumping equipment. The smooth spherical shape ensures unobstructed passage through tubing, casing, and downhole restrictions. The degradable polymer material remains intact during transit, protected by its chemical formulation from premature degradation.

2. Plugging & Diversion Stage

Upon reaching the target perforation interval, the balls encounter the perforation holes. Each ball seats into a circular perforation, creating a pressure-resistant seal that blocks fluid entry into already-stimulated high-permeability zones. Multiple balls are typically deployed simultaneously to seal all perforations in the target zone. This forces the fracturing fluid to divert toward untreated low-permeability intervals, achieving more uniform zonal stimulation.

3. Degradation Stage

After fracturing operations are complete, the polymer balls begin to dissolve in the wellbore chloride fluid at downhole temperature. Within the specified dissolution time (12–72 hours depending on grade and temperature), each ball dissolves completely into non-toxic soluble byproducts that are circulated out during well flowback. Full wellbore drift diameter is restored with no milling, coiled tubing, or cleanout intervention required.

 

Quality Assurance

 

All Degradable Plugging Balls are manufactured and tested under strict quality control:

• Raw material inspection - polymer composition verification, molecular weight testing, and solubility calibration per batch

• Dimensional inspection - ball diameter, sphericity, and surface finish verification per drawing tolerances (diameter tolerance ±0.2mm)

• Density measurement - specific gravity verification per grade

• Compressive strength testing - uniaxial compressive strength test at rated pressure (40MPa or 50MPa) with no deformation or cracking

• Degradation testing - dissolution time verification in standardized brine at specified temperature, with complete dissolution confirmed

• Packaging inspection - sealed moisture-proof packaging (bags or drums) with desiccant, labeled with grade, diameter, batch number, and manufacture date

We provide:

• 12-month product quality warranty from date of shipment

• Custom diameter and degradation rate development

• Technical support for dosage calculation, pumping rate, and degradation time matching

• Each shipment includes material test report (MTR), degradation test certificate, and product data sheet (PDS)

• Third-party inspection (BV/SGS) available on request

 

Application Scenarios

 

• Refracturing of Existing Wells

Temporary sealing of existing perforations to divert refracturing fluid into virgin reservoir rock, bypassing near-wellbore damage and accessing unstimulated zones for improved production recovery.

• Multi-Stage Fracturing of New Wells

Used for temporary zonal isolation between fracturing stages, particularly in plug-and-perf completions where rapid, intervention-free stage isolation is required to minimize rig time.

• Vertical Well Stratified Fracturing

Enables selective fracturing of multiple zones in vertical wells by temporarily sealing perforations in already-treated layers, forcing fluid to flow to untreated intervals - without mechanical packers or bridge plugs.

• Horizontal Well Diversion

Deployed for temporary diversion between perforation clusters in long horizontal wellbores, ensuring more uniform fluid distribution across the entire lateral section.

• Complex Well Stimulation

Suitable for complex wellbore configurations (deviated wells, multilateral wells, old wells) where mechanical isolation tools may be difficult to deploy or retrieve.

• Temporary Zonal Isolation

Provides short-term isolation during well testing, acidizing, or workover operations, then dissolves automatically without intervention - ideal for wells where coiled tubing access is limited or costly.

 

FAQ

 

Q: What is a degradable plugging ball and how does it work?

A: A degradable plugging ball is a soluble polymer sphere that is pumped downhole and seats into perforation holes to temporarily seal them, diverting fracturing fluid to under-stimulated zones. After the job, it dissolves completely in wellbore fluid, leaving no residue.

 

Q: What is the difference between a plugging ball and a soluble bridge plug?

A: A soluble bridge plug is a solid mechanical tool set at a specific depth to isolate an entire zone. A plugging ball is a small sphere that seals individual perforation holes for diversion. Bridge plugs provide full-bore isolation; plugging balls provide selective perforation-level plugging. Both are fully degradable.

 

Q: How long does the ball take to dissolve?

A: Dissolution time depends on the grade and downhole temperature: LB40 ≤20h (20–60°C), LB60 12–24h (60–90°C), HB90 24–72h (90–120°C), HB120 12–48h (120–150°C). Custom dissolution rates are available.

 

Q: What sizes are available?

A: Standard diameters: 9mm, 12mm, 14mm, 15mm, 19mm, 22mm, 26mm. Custom diameters can be manufactured for specific perforation dimensions. The ball diameter should be slightly larger than the perforation diameter for reliable seating.

 

Q: How is the ball deployed?

A: It is simply pumped downhole with fracturing fluid using standard pumping equipment - no specialized setting tools, wireline, or coiled tubing required. The smooth spherical profile ensures unobstructed passage through the wellbore.

 

Q: How many balls are needed per job?

A: Dosage depends on the number of perforations to be sealed, perforation size, and wellbore dimensions. Typically, 1.5–2 times the number of perforations is recommended to ensure full coverage. Our technical team can provide dosage calculations based on your well parameters.

 

Q: Can the ball seal irregular or elongated perforations?

A: The spherical shape is most effective for sealing circular perforations. For irregular or eroded perforations (common in refracturing), we recommend our Knot (fiber-woven) or Perf Frac Diverter (biconic) products, which are specifically designed for non-circular holes.

 

Q: Is the ball compatible with all fracturing fluids?

A: It is compatible with most water-based fracturing fluids, linear gels, and crosslinked fluids. Compatibility with specific additives should be verified prior to use. Our technical team can provide compatibility testing.

 

Q: What is the MOQ and delivery time?

A: MOQ is 100 pieces for standard products. Delivery time is 7–15 working days for standard sizes/grades and 15–25 working days for customized products. We ship from Shanghai or Ningbo port.

 

Q: How should the balls be stored?

A: Store in original sealed packaging in a dry, cool environment (below 25°C, relative humidity <60%), away from direct sunlight, moisture, and heat sources. Shelf life is 12 months from manufacture when stored under recommended conditions.

 

Hot Tags: plugging balls, China plugging balls manufacturers, suppliers, factory, bobbins for oilfield tools, corrosion inhibitors for oilfield tubing accessories, cleaners for oilfield tools, rust preventives for oilfield casing accessories, cleaners for oilfield tubing accessories, viscosifiers for oilfield drill bit accessories

Number Colour Density Bearing strength Dissolution rate Temperature of use
LB40 Pale yellow 0.9-1.5g/cm3 ≥40MPa ≤20h 20-60℃
LB60 White /yellow 0.9-1.5g/cm3 ≥40MPa 12-24h 60-90℃
HB90 white 0.9-1.7g/cm3 ≥50MPa 24-72h 90-120℃
HB120 white 0.9-1.5g/cm3 ≥50MPa 12-48h 120-150℃
Send Inquiry