Mar 06, 2025

Research and Application of Key Drilling and Completion Technologies for the Efficient Development of Ultra

Leave a message

The development of ultra - shallow heavy oil in Junggar Basin faces many challenges. The traditional vertical well development method has the problems of low single - well production and poor economic efficiency. Although horizontal well development can increase production, the drilling and completion technologies face many difficulties. Therefore, we carried out the research and application of key drilling and completion technologies for the efficient development of ultra - shallow heavy oil and achieved remarkable results.

 

Analysis of Technical Difficulties in Drilling and Completion of Ultra - Shallow Horizontal Wells The engineering - geological characteristics of ultra - shallow heavy oil reservoirs in Junggar Basin are unique. The reservoir burial depth is 160 - 250m, with poor diagenesis and softness, mainly consisting of conglomerate, calcareous glutenite, and pebbly sandstone, with medium sorting, an average porosity of 32.2%, an average permeability of 1962mD, and an effective thickness of 2 - 6m. It is a normal - temperature and normal - pressure shallow - layer structural - lithologic heavy - oil reservoir with edge - bottom water. These characteristics lead to the following problems: It is difficult to control the construction trajectory of horizontal wells. The hole enlargement in soft formations is likely to cause abnormal build - up rates of steering tools, and the formation strength near the reservoir section varies greatly, resulting in irregular build - up rates. The effective thickness of the reservoir is thin, the distribution characteristics are complex, and there is edge - bottom water. During drilling, it is necessary to identify and analyze the reservoir encounter situation as soon as possible to improve the encounter rate of high - quality reservoirs. The hole enlargement in soft formations and high - build - up - rate wellbores result in a low casing centralization degree, and the long - cycle huff - and - puff of heavy - oil thermal recovery has high requirements for the late - strength - decay performance of cement slurry.

 

Research on Key Drilling and Completion Technologies for Ultra - Shallow Horizontal Wells Drilling Engineering Design Technology Optimized Design of Wellbore Structure: Combining with the regional shallow - layer engineering - geological characteristics, two sets of wellbore structure series are optimized to meet the technical requirements of horizontal well drilling construction at different burial depths and different horizontal section lengths. Optimized Design of Wellbore Trajectory: Taking Block P609 as an example, the development wells are designed as "high + medium + low" multi - section trajectories. By optimizing the trajectory control process technology in the upper soft formation, the construction of the high - build - up - rate well section is ensured, effectively avoiding the trajectory out - of - control in abnormal - build - up - rate well sections and reducing the risk of drilling through the oil layer under uncertain vertical depth conditions. Key Trajectory Control Technologies Development of High - Build - up - Rate Positive - Displacement Motor: A new type of positive - displacement motor with a short bending point and a short overall length is developed, which can reduce the compound drilling torque in the horizontal section, improve the downhole construction safety factor, and at the same time significantly shorten the measurement zero - length and reduce the trajectory adjustment during reservoir drilling. Fine Trajectory Segmented Control Technology: Through the fine control of different drill string assemblies in the first and second spud - ins, combined with slide drilling and compound drilling to ensure the wellbore smoothness, and track and adjust the wellbore trajectory according to the real - time measurement information of the geological steering system to ensure the maximum reservoir encounter rate. Technology for Improving the Encounter Rate of Thin - Layer Heavy - Oil Reservoirs: Select and apply a multi - frequency and multi - depth electromagnetic wave resistivity measurement system to shorten the zero - length of inclination measurement and reduce the blind area of inclination measurement; develop and apply reservoir sweet - spot precise identification software to real - time judge the position and traversing state of the bit in the reservoir, so that the average encounter rate of ultra - shallow reservoirs reaches 98%. Key Cementing and Completion Technologies Research and Development of High - Performance Cement Slurry for Cementing: Develop the low - temperature early - strength plastic micro - expansion cement slurry cementing technology for thermal recovery wells to improve the anti - leakage and plugging performance, the strength, toughness, and thixotropy of the cement slurry, shorten the thickening time of the cement slurry under low - temperature conditions, improve the early - strength development, and effectively improve the displacement efficiency. Research and Development of Cementing and Completion Tools for Ultra - Shallow Horizontal Wells: Optimize and improve the integral elastic centralizer to increase the strength of the centralizer, widen the contact area with the wellbore, and improve the casing centralization degree; develop cementing tools such as easy - to - drill float collars and float shoes, and the improved resin material used has strong drillability, and the plug - drilling time is shortened to 3h.

 

Field Application Effects Since 2021, the key drilling and completion technologies for ultra - shallow horizontal wells have been successfully applied in more than 50 wells in the ultra - shallow heavy - oil reservoirs in Junggar Basin. Taking Blocks P609 and P634 as examples, the average drilling and completion cycle is only 6 days, the average reservoir encounter rate is 98%, and the cementing quality qualification rate is 100%. Among them, the completed vertical depth of Well P609 - P5 is 176.5m, setting the record for the shallowest completed vertical depth of horizontal wells in Shengli Junggar Exploration Area; the vertical - to - horizontal ratio of Well P609 - P6 reaches 2.61, setting the record for the largest vertical - to - horizontal ratio of horizontal wells in Shengli Junggar Exploration Area; the drilling cycle of Well P634 - P31 is only 3.09 days, and the well construction cycle is 4.96 days, setting the record for the shortest drilling and completion cycle of horizontal wells in Shengli Junggar Exploration Area.

 

Conclusions and Suggestions Through the research and application of key drilling and completion technologies for the efficient development of ultra - shallow heavy oil, the technical problems in drilling and completion of ultra - shallow heavy - oil horizontal wells in Junggar Basin have been successfully solved, and a series of key drilling and completion technologies for ultra - shallow horizontal wells have been formed. The application results show that this technology improves the trajectory control ability and the encounter rate of high - quality reservoirs, and enhances the cementing quality of horizontal wells and the efficiency of completion operations. However, the pertinence and applicability of the existing technologies are insufficient. It is necessary to further carry out the research on ultra - shallow large - displacement horizontal wells and multi - branched well technologies to reduce the development cost of ultra - shallow heavy oil. In the future, we will continue in - depth research, continuously improve and optimize the drilling and completion technologies for the efficient development of ultra - shallow heavy oil, and provide strong support for the efficient development of ultra - shallow heavy oil in Junggar Basin.

Send Inquiry