1. Separate different liquids and scrape the drilling fluid and cement slurry on the inner wall of the casing.
2. When the pressure is completed, the pressure signal is given to indicate that the cementing operation is completed.
3. It can ensure the length of the cement plug in the casing and the quality of the cement ring near the casing shoes.
