Aug 05, 2024

What is cementing?

Leave a message

The construction work of inserting the casing into the well and injecting cement into the annular space between the wellbore and the casing is called cementing engineering. The main purpose of cementing is to protect and support the casing in the oil and gas well, and to seal the oil, gas and water strata.

 

Cementing is mainly divided into three steps: casing, cementing, wellhead installation and casing pressure testing.

 

Send Inquiry