Shale gas extraction

Leave a message

I. Case Background

A shale gas horizontal well with a horizontal section length of 2000 meters is planned for 10-stage fracturing. To improve fracturing efficiency and reduce costs, a combined application of dissolvable bridge plugs and fast-drilling bridge plugs is adopted.

 

II. Scheme Design

Near-wellbore (Stages 1-5): Use fast-drilling bridge plugs. Fast-drilling bridge plugs have high pressure-bearing capacity and stability, meeting the demands of high-pressure, high-rate fracturing near the wellbore.

 

Far-wellbore (Stages 6-10): Use dissolvable bridge plugs. Dissolvable bridge plugs can self-dissolve after fracturing, eliminating the need for drilling out, thus saving operation time and costs.

 

III. Construction Steps

Run Bridge Plugs: Run fast-drilling bridge plugs and dissolvable bridge plugs sequentially according to the designed positions.

Perforation Operation: Use wireline or tubing-conveyed perforating guns to perforate the target intervals.

Fracturing Operation: Conduct fracturing for each stage according to the designed parameters.

Dissolve Dissolvable Bridge Plugs: After fracturing, the dissolvable bridge plugs self-dissolve under downhole temperature and pressure conditions.

Drill Out Fast-drilling Bridge Plugs: Use coiled tubing or drill pipe to drill out the fast-drilling bridge plugs near the wellbore.

Put into Production: After completing all operations, conduct flowback testing and put the well into production.

 

IV. Precautions for Bridge Plug Perforation Operations

Bridge Plug Selection: Select appropriate bridge plug types and specifications based on well conditions, fracturing design, and cost factors.

Bridge Plug Setting: Strictly follow operating procedures to ensure accurate setting positions and reliable sealing.

Perforation Parameters: Optimize perforation parameters, including perforation density, hole size, and phasing, based on reservoir properties and fracturing design.

Fracturing Fluid Selection: Choose fracturing fluids compatible with bridge plug materials to avoid corrosion or dissolution of the plugs.

Operation Monitoring: Monitor real-time operation parameters such as pressure and rate to promptly identify and address anomalies.

Safety and Environmental Protection: Strictly adhere to safety operating procedures and ensure environmental protection measures are in place.

 

V. Advantages Analysis

Improve Efficiency: Dissolvable bridge plugs eliminate the need for drilling out, saving operation time and improving fracturing efficiency.

Reduce Costs: Decrease the number of drilling operations, lowering operational costs.

Mitigate Risks: Avoid risks such as stuck pipes and blowouts during drilling operations.

Protect Reservoir: Dissolvable bridge plugs do not damage the reservoir after dissolution.

 

VI. Summary

The combined application of dissolvable bridge plugs and fast-drilling bridge plugs can effectively improve fracturing efficiency, reduce costs, and mitigate risks in shale gas horizontal wells, demonstrating promising application prospects. In practical applications, it is essential to optimize the design based on specific conditions and strictly control construction quality to ensure operational safety and effectiveness.

 