In today's energy field, shale gas, as an important unconventional energy source, is of great significance for the innovation and breakthrough in its development technology. The drilling project of Well Jiaoye 9 - 12HF is a successful practice in shale gas drilling technology.
First of all, based on the characteristics of shale formations and the requirements of complex drilling conditions, a composite salt - water - based drilling fluid system emerged. This system uses composite salt water as the base fluid. With its strong inhibition and non - solid - phase weighting ability, it has solved the problems of insufficient lubricity of existing water - based drilling fluids, the lack of salt resistance of conventional drilling fluid materials and the low salt - resistance concentration.
Moreover, four key core additives, namely salt - resistant lubricant, emulsion fluid - loss - reducing agent, emulsion encapsulating agent and emulsion plugging agent, were developed and optimized, laying a solid foundation for the construction of this system. Subsequently, this system was successfully constructed and a detailed on - site application plan was formulated.
Secondly, after being reviewed and demonstrated by many experts, this system was first tested on - site in Well Jiaoye 9 - 12HF. This ultra - large - offset three - dimensional horizontal well faced many construction risks such as anti - collision and obstacle - avoidance, fracturing fluid invasion, well leakage and great difficulty in trajectory control, which imposed extremely high requirements on the drilling fluid system to deal with complex downhole conditions. To ensure the application effect, the company and Drilling Company No. 2 jointly established an on - site application team and selected key technical personnel to participate. During the construction period, performance evaluation and small - sample tests were carried out more than 70 times in total. Through continuous debugging and optimization, many technical problems such as drilling fluid pollution, well leakage and formation gas invasion were solved. Finally, the horizontal section was drilled in one trip, and there was no sloughing or caving in the third - spud section after being soaked for 37 days. The casing was run to the bottom in one trip and the cementing was successful.
The smooth completion of Well Jiaoye 9 - 12HF fully demonstrates that this composite salt - water - based drilling fluid system has the characteristics of strong inhibition, low friction coefficient, small solid - control pressure, easy regulation of flow pattern, easy maintenance of performance, environmental protection and no odor.
