Product Introduction
The Dragging Frac Packer is a state-of-the-art downhole tool, purpose-built to address the core pain points of conventional multi-stage fracturing operations: high operational costs, long non-productive time (NPT), and complex drill-out procedures for permanent bridge plugs. As a leading cost-effective well stimulation solution, this packer enables one-trip multi-stage fracturing: it can be reliably set, released, and dragged to the next target interval repeatedly in a single run, with no need to retrieve the entire tubing string from the wellbore.
Manufactured in strict compliance with API Spec 11D1 standards, our dragging frac packer is compatible with a wide range of casing sizes and wellbore conditions, from standard vertical wells to complex extended-reach horizontal wells. It is widely adopted in unconventional oil and gas development, old well re-fracturing, and formation stimulation projects worldwide, delivering proven stable performance in extreme downhole environments with high temperature, high pressure, and corrosive formation fluids.
Product Features
1.Repeatable Setting & Releasing, One-Trip Multi-Stage Operation : Precision-engineered hydraulic setting and mechanical releasing mechanism, enabling stable setting and full releasing for over 20 times in a single wellbore .Eliminates the need for multiple tripping and costly bridge plug drill-out operations, cutting overall fracturing operation time by up to 60% and significantly reducing well completion costs .
Minimizes wellbore damage caused by repeated tripping and drill-out, preserving the long-term integrity of the production casing
2. Ultra-High Temperature & Pressure Resistance, Adaptable to Extreme Environments : Premium grade HNBR/FKM elastomer seal elements, with optional temperature ratings of 120°C (248°F), 150°C (302°F), 180°C (356°F), and 204°C (400°F) .High-strength alloy steel body construction, with standard working pressure up to 70MPa (10,000 PSI) and optional high-pressure grade up to 105MPa (15,000 PSI), adapting to high-pressure fracturing in deep wells .Corrosion-resistant coating and material options (H2S/CO2 resistant alloy) available for sour gas wells and corrosive formations, extending tool service life
3. Superior Sealing & Anchoring Performance, Zero Leakage During Fracturing : Dual-seal rubber cylinder design with anti-extrusion rings, ensuring reliable metal-to-metal and rubber-to-casing sealing even under extreme pressure fluctuations during high-rate fracturing .Bi-directional slip anchoring system with high-grip carbide inserts, providing firm casing wall anchoring to prevent packer movement during both injection and flowback operations .Built-in hydraulic anchor mechanism, eliminating string vibration and axial displacement during high-rate fracturing, ensuring stable operation and reducing equipment wear .
4. Reliable Dual Releasing Mechanism, Low Sticking Risk : Dual optional releasing modes: primary straight-pull mechanical releasing and secondary hydraulic pressure releasing, providing backup solutions for complex wellbore conditions .Optimized full-bore flow design, minimizing pressure loss during fracturing fluid injection, supporting high-rate proppant pumping without clogging .Large internal bypass channel, automatically balancing tubing-annulus pressure during releasing, eliminating swabbing effects and drastically reducing differential pressure sticking risk .
5. Wide Compatibility & Easy Maintenance :Compatible with most standard tubing sizes and casing weights, covering common casing sizes from 4-1/2" to 9-5/8".Modular design for easy disassembly, maintenance, and component replacement, reducing on-site repair time and lowering long-term operating costs .Can be combined with other downhole tools (sliding sleeves, circulation valves, safety joints, etc.) to form a complete multi-stage fracturing completion system .
Working Principle
The Dragging Frac Packer operates through a simple, reliable hydraulic setting and mechanical releasing workflow, enabling seamless multi-stage fracturing in a single trip :
- Run-In Hole (RIH): The packer is assembled to the end of the tubing string and lowered to the first target fracturing interval. During running, slips and rubber elements are fully retracted to minimize friction and casing damage.
- Setting Operation: Once positioned at the target depth, pressurized fluid is pumped down the tubing. Hydraulic pressure drives the piston to compress the rubber element, expanding it to form a tight seal between the tubing and casing annulus. Simultaneously, bi-directional slips are pushed out to firmly anchor the packer to the casing wall. When the set pressure reaches the preset value, the setting mechanism automatically locks, maintaining sealing and anchoring even after tubing pressure is released.
- Fracturing Operation: With the packer securely set, high-rate fracturing fluid with proppant is pumped through the tubing to the target formation, completing stimulation of the first interval. The packer maintains zero annulus leakage and stable anchoring throughout the high-pressure fracturing process.
- Releasing & Dragging: After fracturing the first interval, tubing pressure is bled off to balance downhole pressure. A straight upward pull is applied to the tubing, triggering the mechanical releasing mechanism to unlock the slips and retract the rubber element, fully releasing the packer from the casing. The packer can then be dragged to the next target interval without pulling the tubing out of the hole.
- Repeat Operation: Steps 2-4 are repeated for all target intervals. Once all stages are completed, the packer is fully released and retrieved to the surface along with the tubing string, leaving no downhole debris in the wellbore.
Quality Assurance & Certifications
- API Compliance: All Dragging Frac Packer products are designed, manufactured, and tested in strict accordance with API Spec 11D1 standards for packers and bridge plugs.
- International Certifications: ISO 9001 Quality Management System Certification, API Q1 Certification, ensuring consistent product quality and production standards.
- Rigorous Factory Testing: Every single packer undergoes full-scale pressure testing, setting and releasing function testing, and dimensional inspection before delivery, with official test reports provided for each unit.
- Material Traceability: All raw materials have complete mill test reports (MTRs), with full traceability from material sourcing to finished product delivery.
- Third-Party Inspection: BV, SGS, DNV and other international authoritative third-party inspection services are available upon customer request.
Application Scenarios
- Multi-stage hydraulic fracturing in horizontal wells for unconventional shale gas, tight oil, and tight gas reservoirs
- Re-fracturing and stimulation of old mature wells to restore and enhance production
- Vertical and directional well fracturing for conventional oil and gas reservoirs
- Coal Bed Methane (CBM) and coal seam gas fracturing operations
- Acidizing and matrix stimulation operations requiring zonal isolation
- Extended-reach well (ERW) and deep well fracturing with high temperature and high pressure conditions
- Sour gas well operations with H2S and CO2 corrosive environments (with custom corrosion-resistant materials)
FAQ
Q: What casing sizes are compatible with your Dragging Frac Packer?
A: Our standard dragging frac packer is compatible with common casing sizes ranging from 4-1/2" to 9-5/8", covering the vast majority of oil and gas well completion specifications. We also provide custom design and manufacturing for non-standard casing sizes from 3-1/2" to 13-3/8" to meet your specific wellbore requirements.
Q: What is the maximum temperature and pressure rating of the packer?
A: Our standard packer has a working temperature rating of up to 150°C (302°F) and a working pressure rating of 70MPa (10,000 PSI). For extreme downhole conditions, we offer high-performance models with a maximum temperature rating of 204°C (400°F) and a maximum working pressure rating of 105MPa (15,000 PSI), with custom corrosion-resistant materials available for sour gas wells.
Q: What is the core difference between a Dragging Frac Packer and a conventional bridge plug?
A: The core difference lies in operational efficiency and total cost:
- A conventional bridge plug is a permanent or semi-permanent tool that requires a separate drill-out operation after fracturing, which adds significant time, labor cost, and wellbore damage risk.
- Our dragging frac packer is fully retrievable and repeatable: it can be set, released, and dragged to multiple intervals in a single tubing trip, eliminating drill-out operations entirely, cutting completion time by up to 60%, and reducing overall operational costs significantly. It also leaves no debris in the wellbore, preserving long-term well integrity and production performance.
Q: How many times can the packer be set and released in a single well?
A: Under standard wellbore conditions and proper operation, our dragging frac packer can be reliably set and released for more than 20 times in a single wellbore, fully meeting the needs of multi-stage fracturing operations with dozens of stages. The actual number of cycles can be extended with proper on-site maintenance and component inspection.
Q: What certifications do your products have?
A: All our dragging frac packer products are manufactured in full compliance with API Spec 11D1 standards, and we hold ISO 9001 Quality Management System Certification and API Q1 Certification. We can also provide third-party inspection reports from BV, SGS, DNV, and other international authoritative institutions upon customer request.
Q: Can you customize the packer according to our specific well conditions?
A: Yes, we provide full custom design and manufacturing services based on your wellbore parameters and operational requirements. Customizable items include: casing size compatibility, temperature and pressure ratings, material options (corrosion-resistant alloys for H2S/CO2 environments), connection threads, releasing modes, and compatible accessory combinations. Our professional engineering team will work with you to develop a tailored solution for your specific project.
Q: What is the typical lead time for orders?
A: For standard models in common sizes (4-1/2", 5-1/2", 7" casing), we maintain a certain safety inventory, with a lead time of 3-7 working days for sample orders and small bulk orders. For large bulk orders and custom-designed products, the lead time is typically 15-30 working days, depending on the order quantity and customization requirements. We will provide a clear delivery schedule in the official quotation.
Q: What should we do if the packer cannot be released during operation?
A: Our dragging frac packer is designed with a dual backup releasing mechanism: the primary straight-pull mechanical releasing and a secondary hydraulic pressure releasing mode. If the primary mechanical releasing fails, you can activate the hydraulic releasing mode by applying preset pressure to the tubing string. In addition, our technical support team provides 24/7 on-site and remote operational guidance to help you resolve any on-site issues in a timely manner.
Q: Is the packer compatible with high-rate proppant fracturing operations?
A: Yes, absolutely. Our packer features an optimized full-bore flow channel design, with a smooth internal flow path that minimizes pressure loss and avoids proppant settling and clogging. It is fully compatible with high-rate fracturing operations with large proppant volumes, and has been widely used in shale gas and tight oil fracturing projects worldwide.
Q: What after-sales support do you provide?
A: We provide comprehensive after-sales support for all our products, including:
- 24/7 remote technical support and operational guidance from our experienced engineering team
- On-site technical service and operation training for your field crew, available worldwide
- 12-month warranty period for all new products, with free replacement of defective parts under normal use
- Long-term supply of spare parts and maintenance services, with technical support for tool inspection and repair
- Customized operational procedure manuals and training materials in English and other languages
Hot Tags: dragging frac packer, China dragging frac packer manufacturers, suppliers, factory, Compression Open Hole Packer, Single Grip Retrievable Packer, Dragging Frac Packer, Retrievable Compression Packer, Hydro Set Retainer Production Packer, Large Bore Double Grip Retrievable Packer
| Item | Specification | Optional Customization |
|---|---|---|
| Applicable Casing Size | 4-1/2", 5", 5-1/2", 7", 7-5/8", 8-5/8", 9-5/8" | 3-1/2" to 13-3/8" |
| Packer Outside Diameter (OD) | Matched to casing size (e.g., 3.75" for 4-1/2" casing, 4.75" for 5-1/2" casing) | Custom OD for non-standard casing |
| Inside Diameter (ID) | 1.5" to 3.5" (matched to tubing size) | Custom ID for high-rate fracturing |
| Working Temperature Rating | 120°C (248°F), 150°C (302°F) | 180°C (356°F), 204°C (400°F) |
| Working Pressure Rating | 70MPa (10,000 PSI) | 105MPa (15,000 PSI) |
| Connection Thread | API EUE/NUE Tubing Threads, API BTC/LC/STC Casing Threads | Custom premium threads |
| Body Material | P110 High-Strength Alloy Steel | L80, 13Cr, 22Cr Duplex Stainless Steel (H2S/CO2 Resistant) |
| Seal Element Material | High-Grade HNBR | FKM (Viton) for high-temperature/corrosive environments |
| Releasing Mode | Straight-Pull Mechanical Releasing | Dual Hydraulic + Mechanical Releasing |







